12. Metrics

Part of the RENAR Standard v1.1 · ← Table of contents

12.1 What to measure in requirements

The general SENAR metrics (§9) will show that the team is fast and the tests are green. But they will not notice an AI agent quietly inserting into an SR a clause that was in neither the TZ nor the ADAPT — until it surfaces at acceptance as a dispute with the client. "The process as a whole" is healthy, yet the requirements work is not. So RENAR adds eleven metrics that look specifically at requirements: how often an AI agent invents a clause without a source (Hallucination Rate), whether paired tests catch real defects, how quickly a delta-TZ reaches the code. This is an overlay on SENAR §9, not a replacement.

The list of metrics is closed; for each one, a formula, a target per maturity level (chapter 11), and a data source are specified. Metrics are collected natively for the substrate through V1–V6 (chapter 3); exactly how to render dashboards is an implementation question deferred to guide/. This chapter does not duplicate SENAR §9 but specializes it, and it does not touch ROI or pricing — those are not process indicators but business effects (§12.5).


12.2 Relationship to SENAR §9

SENAR §9 defines ten general-process metrics: Throughput, Lead Time, FPSR (First-Pass Success Rate), DER (Defect Escape Rate), KCR (Knowledge Capture Rate), Cost Predictability, Cost-per-task, MIR (Memory Integrity Rate), Cycle Time, ADR (Adversarial Detection Rate).

RENAR §12 does not edit and does not replace these metrics. The REQ-specific metrics of §12.3:

  • Refine a SENAR metric for the requirements phase (for example, RDLT refines SENAR Lead Time for the requirements phase).
  • Add observations specific to requirements engineering and not covered by SENAR §9 (Hallucination Rate, Multi-model Disagreement Rate).

The full mapping — §12.7.

The closed list of REQ metrics (§12.3) is maintained within RENAR; SENAR §9 is a separate closed list of general metrics. Changing either of the two lists is a formally independent change procedure of the respective standard.


12.3 Closed list of REQ-specific metrics

A closed list of eleven REQ metrics. The list is changed only through the formal change procedure of the standard (§13.9.3); the general closed-list policy and master index — §1.7.5.

12.3.1 RDLT — Requirement Decomposition Lead Time

The time from registering a TZ in the substrate to the approval of the first description set version containing the whole BR/SR tree of this TZ (QG-0 of the set, §10.5.2). Formula: RDLT = timestamp(set-version with the full TZ tree → approved) − timestamp(TZ registered). Measured in hours/days. Source: the audit log of promote-transitions (§10.13). Relationship to SENAR: a refinement of SENAR Lead Time for the requirements phase. Targets: RENAR-3 < 1 week per 50-page TZ; RENAR-4 < 2 days; RENAR-5 < 4 hours.

12.3.2 Requirement-to-Task Latency

The time from the approval of the set version in which the SR is first approved to the creation of the first TR with the reference implements: SR-N. Formula: Latency = timestamp(first TR.created) − timestamp(first set-version ∋ SR → approved). Hours. Source: the substrate audit log + the cross-substrate references of the implementation substrate. Relationship to SENAR: a refinement of SENAR Cycle Time for the "requirement → executable task" pair. Targets: RENAR-3 < 3 days; RENAR-4 < 1 day; RENAR-5 < 1 hour (auto-create TR after approval).

12.3.3 Hallucination Rate

The percentage of normative assertions in an AI-generated artifact (BR/SR/SPEC) that are not traceable to a source (TZ/ADAPT/another normative artifact). Source citation is checked by a native citation parser (§13.3.1, REQUIRED at RENAR-4). Formula: assertions_without_valid_citation / total_normative_assertions × 100%. Per artifact; aggregated per project. Source: the citation parser (AST or regex over inline references [TZ-XXX §Y] / [ADAPT-NNN §Z]). Relationship to SENAR: a new metric; corresponds to ISO/IEC 5338 traceability for AI-generated artifacts. Targets: RENAR-1..3 n/a; RENAR-4 ≤ 5%; RENAR-5 ≤ 1%.

Negative scenario (loss-of-conformance trigger): a Hallucination Rate > 5% on a RENAR-4 project is a normative loss-of-conformance trigger (§13.8.1); remedy it through a release recovery plan or downgrade to RENAR-3.

12.3.4 Multi-model Disagreement Rate

The percentage of artifacts with priority: must where two (or more) generating AI models produced normative assertions diverging beyond a threshold (by default, embedding similarity < 85%; the threshold is fixed in the manifest under declared-stricter). Formula: BRs_with_high_disagreement / total_must_BRs × 100%. Source: the multi-model runs log; embedding similarity computed offline over "model A vs B" pairs. Relationship to SENAR: a new metric. Targets: RENAR-1..4 n/a; RENAR-5 tracked, with per-project baseline values in the first quarter. Interpretation: a high value is an indicator of weak prompt engineering or a complex problem domain; it warrants attention but is not in itself a negative indicator.

12.3.5 DRA — Dispute Rate at Acceptance

The percentage of BR/SR for which, at the QG-4 stage (§10.4.2), the client declared disagreement with the interpretation or coverage. Formula: disputed_BRs_at_QG4 / total_BRs_in_release × 100%. Source: the QG-4 audit log — a gate-id: QG-4 event with result: disputed. Relationship to SENAR: a refinement of DER (Defect Escape Rate) for requirements. Applicability: only when QG-4 is in the manifest; when QG-4 = absent (§13.3.6) — not measured. Targets: RENAR-3 ≤ 10%; RENAR-4 ≤ 5%; RENAR-5 ≤ 2%.

12.3.6 ACR — Adversarial Catch Rate

The percentage of artifacts (BR/SR/SPEC) where the AI critic (a different model; REQUIRED at RENAR-5 per §11.8.1) found ≥ 1 high-severity issue before QG-0. Formula: artifacts_with_critic_high_findings / total_reviewed_by_critic × 100%. Source: the critic-runs audit log; severity (high/medium/low) in the critic output. Relationship to SENAR: a subclass of ADR (Adversarial Detection Rate) for requirements. Targets: RENAR-1..3 n/a; RENAR-4 optional (if declared-stricter — a baseline level of 20–30%; values < 20% are an indicator of a weak critic or of duplicating the primary); RENAR-5 tracked normatively, a rising ACR warrants attention to prompt quality. In the first-party confirmation kind (§1.4.4) the metric is mandatory at any level: the adversarial review is the only independent check there, and the ACR is the measure of its non-degeneracy (§13.9.4).

12.3.7 Test-spec Drift Rate

The percentage of TC implementations with last-run.result = pass (§10.9.1) whose automation.set-version (§9.12) is earlier than the set version in which their norm was last changed (§10.9.4). Formula: stale_passing_TCs / total_passing_TCs × 100% (stale = the implementation is stale). Source: the COVERAGE artifact (§9.15). Relationship to SENAR: a new metric. Targets: RENAR-1..3 n/a; RENAR-4 ≤ 5%; RENAR-5 ≤ 1% (auto-rerun on delta-ADAPT).

12.3.8 Coverage Velocity

The share of TC norms of the current set version whose implementations passed on it (last-run.set-version = N.M, §10.3.3), gained per unit of time (default iteration; the substrate MAY define a different interval in the manifest). Formula: (passed_on_version(end) − passed_on_version(start)) / tc_count(N.M) × 100%. Source: the COVERAGE artifact history (§9.15). Relationship to SENAR: a refinement of Throughput for requirements. Targets: RENAR-3 ≥ 30%/iteration; RENAR-4 ≥ 50%/iteration; RENAR-5 ≥ 70%/iteration.

12.3.9 Cost per Approved Requirement

The AI-generation cost (input tokens + output tokens × tariff) normalized to one artifact that first entered an approved set version, including rejected drafts (which remain in the substrate by virtue of V1 immutable history). Formula: total_AI_tokens_cost(period) / count(artifacts_first_approved_in_period). Project currency. Source: the ai-provenance.cost-budget + ai-provenance.cost-actual frontmatter fields (§11.7.1). Relationship to SENAR: a refinement of Cost-per-task for requirements. Targets: RENAR-1..3 n/a; RENAR-4 tracked, with per-project baseline values; RENAR-5 tracked + year-over-year reduction or a justification.

12.3.10 Reconciliation Findings per Week

The number of issues detected by the reconciliation agent (§2.4.2 continuous reconciliation) per week and registered as backward findings in a delta-ADAPT or a direct change-set requirement. Formula: count(reconciliation_findings_registered) / weeks_in_period. Source: the reconciliation-runs audit log + the ADAPT backward findings list (§7.4.5). Relationship to SENAR: a new metric. Targets: RENAR-1..3 n/a; RENAR-4 tracked > 0 (zero = the reconciliation hook is not working or V5 is lost); RENAR-5 trending down over the long term (a mature process does not generate new drift).

12.3.11 Implementation-originated Rate

The share of requirements of the class source: implementation-originated (§6.13) among all requirements added over the period. Formula: IOR = count(SR where source=implementation-originated) / count(all SR added) × 100%. Source: the source frontmatter field + the audit log. SENAR mapping: a new metric. A zero value over a period in the presence of manual walkthrough records (§9.20) is a sign of a formal walkthrough, not of the absence of findings (after the pattern of §12.3.10). Why the metric is mandatory. The implementation-originated class is a narrow legalization of internal technical details that arise during implementation. It is useful while it stays rare: its growth means that the requirements process is leaking — functionality is born in the code rather than in the requirements, and is legalized after the fact. The norm of §6.13 requires this drift to be visible, not smeared imperceptibly across the project.

Targets: RENAR-3 ≤ 15%; RENAR-4 ≤ 5%; RENAR-5 ≤ 2%. Exceeding them is not in itself a breach of conformance, but it MUST be examined at the review (§12.5.3): either the requirements are written insufficiently completely, or the "observable by the client" boundary is being construed too broadly.


12.3bis Degeneracy measurers for mandatory controls (informative)

This section introduces no metrics and does not extend the closed list of §12.3. It collects what already applies: which of the eleven metrics shows that a given mandatory control is being executed formally. A control executed formally yields a degenerate value — zero findings, zero objections, a hundred per cent agreement — and by every other sign looks healthy: the signature is there, the record is issued, the gate is green.

Mandatory control Degeneracy measurer
QG-0 — approval (§10.3.1) ACR §12.3.6 — the critic finds ≥ 1 high-severity issue before QG-0; Hallucination Rate §12.3.3 — statements with no traceable source passed the gate
QG-2 — verification (§10.3.3) Test-spec Drift Rate §12.3.7 — TC in passing against a stale set version
Adversarial review (§7.10.2) ACR §12.3.6 — values below 20% indicate a weak critic
ACTZ dual signature (§7.13) DRA §12.3.5 — the client disputes at acceptance what they signed; applicable only when QG-4 is declared
Drift-detection hook (§2.3.3) Reconciliation Findings/Week §12.3.10 — zero means the hook is not working
The implementation-originated class (§6.13) IOR §12.3.11
Version pair coverage coverage-presence at QG-0 (§10.11.1, §13.3.5) Test-spec Drift Rate §12.3.7 — the pairs exist, but the implementations were run on a previous set version; substantive degeneration (a pair written for the count) is the same gap as pos/neg pairing below
Screen-list coverage (§8.5.6.1) Reconciliation Findings/Week §12.3.10 — class 4.11.3 findings about screens: zero with a live interface means the list was copied from the existing SPEC-UIs rather than derived from the description
Confirmation of component assumptions in the uses edge (§6.14.4) ACR §12.3.6 over the assumptions[] section — not one assumption contested by the adversarial review with a non-empty list; DRA §12.3.5 — the consumer's client disputes behaviour "confirmed" by an assumption
Description-language rules (§15.7) Multi-model Disagreement Rate §12.3.4 — formally conforming text is read by models as differently as free prose; ACR §12.3.6 — zero wording remarks at review
Non-empty SPEC-ARCH and SPEC-SEC at the system level (§8.3) ACR §12.3.6 over these two types — zero findings means a document written for presence; Hallucination Rate §12.3.3 — SPEC-SEC statements without a traceable source

For QG-1, the Architect's signature on an ADAPT, the AT release acceptance gate, the red history of a TC, and pos/neg pairing (including its version form, coverage-presence) there is no measurer in force. This is a recorded gap, not an omission: it should be closed case by case, each on its own analysis, rather than by a blanket clause.


12.4 Summary table of targets by level

The closed list of 11 metrics from §12.3 — target values for the applicable levels.

Metric RENAR-3 RENAR-4 RENAR-5 Data source
RDLT (Decomposition Lead Time) < 1 week < 2 days < 4 hours promote-transitions audit log
Requirement-to-Task Latency < 3 days < 1 day < 1 hour audit log + cross-substrate refs
Hallucination Rate n/a ≤ 5% ≤ 1% citation parser
Multi-model Disagreement Rate n/a n/a tracked multi-model runs log
DRA (Dispute Rate at Acceptance) ≤ 10% ≤ 5% ≤ 2% QG-4 audit log (if QG-4 declared)
ACR (Adversarial Catch Rate) n/a optional (if critic declared-stricter) tracked normatively critic-runs audit log
Test-spec Drift Rate n/a ≤ 5% ≤ 1% COVERAGE artifact
Coverage Velocity ≥ 30%/iteration ≥ 50%/iteration ≥ 70%/iteration COVERAGE history
Cost per Approved Requirement n/a tracked tracked + optimized ai-provenance fields
Implementation-originated Rate ≤ 15% ≤ 5% ≤ 2% frontmatter source + audit log
Reconciliation Findings/Week n/a tracked (> 0) trending down reconciliation audit log

The concrete substrate-native presentation of these metrics in dashboards is substrate-specific and deferred to guide/.

The target values for RENAR-4 / RENAR-5 are provisional: set as normative direction markers, not as statistically validated values. The clause covers the seven metrics that carry a number in the table: RDLT, Requirement-to-Task Latency, Hallucination Rate, DRA, Test-spec Drift Rate, Coverage Velocity, Implementation-originated Rate. It does not cover metrics whose value is n/a, tracked, or optional — there is nothing there to calibrate.

Calibration condition. The threshold of a given metric becomes subject to calibration once reported data for that metric have accumulated from no fewer than five independent adopting organizations (independent = a separate legal entity; several projects of one organization count as one), each contributing no fewer than one completed cycle (from TZ import to the verification record of the version at QG-2 for the artifacts the metric covers; for DRA — to QG-4), with the data traceable to a published conformance manifest (§13.4). The quorum is procedural, not statistical: it separates calibration from conjecture, but grants no basis for claiming statistical validity.

Who declares the condition met. Only the formal change procedure of the standard (§13.9): the standard team publishes a calibration report stating the data set, the sources, and the number of organizations and completed cycles per metric, after which the new values enter the corpus through a minor-version bump. Neither an individual nor an adopting organization declares the condition met unilaterally.

Until calibration the thresholds apply as they stand but are not considered validated: exceeding an uncalibrated threshold does not by itself entail loss of conformance (§13.8.1). See guide/07 §8.1.


12.5 Business outcomes

Six normative effects of adopting RENAR, expected at the RENAR-3 level and above. The outcomes are normative expectations of the standard, not process indicators; measuring them is substrate-specific and not mandatory (although the §12.3 metrics capture them indirectly).

ROI / cost-of-adoption is a non-normative topic and is not part of a normative chapter. A lightweight illustrative (not guaranteed) model of the cost and benefit of adoption for a decision-maker — in guide/02-transition-guide.

12.5.1 Outcome 1 — Reduced TZ decomposition time

Measured through §12.3.1 RDLT. Expected reduction from the baseline: on the order of 5–10× at RENAR-4, 20–50× at RENAR-5.

12.5.2 Outcome 2 — Lower dispute frequency at acceptance

Measured through §12.3.5 DRA. Expected reduction: from 15–30% to ≤ 5% at RENAR-4, ≤ 2% at RENAR-5.

12.5.3 Outcome 3 — Audit readiness

The event audit log (§10.13) + AI provenance in frontmatter (§11.7.1) provide a compliance audit without separate preparatory work. Applicable to regulated industries (medicine, fintech, the public sector).

12.5.4 Outcome 4 — Lower cost of working with a delta-TZ

Impact analysis (§9.16) + reverse evolution of verification (§10.5.4) automate the handling of a delta-TZ. Expected reduction in human involvement: from tens of hours to an hour per delta.

12.5.5 Outcome 5 — Lower knowledge loss on team turnover

V6 author + timestamp (§3.3.6) records the author of all artifacts; the Source-of-Truth inversion (§2.3.1) moves knowledge out of people's heads into the substrate. Expected reduction in onboarding: from weeks to days.

12.5.6 Outcome 6 — The standard as a sellable product

At RENAR-⅘ a substrate-native implementation MAY be licensed to partners as an actionable product. A structural consequence of a formal standard, not a process metric.


12.6 Substrate-independent metric collection

12.6.1 Normative requirements

A substrate implementing RENAR at the RENAR-4+ level MUST provide automatic collection of the §12.3 metrics through:

Source Capabilities Accessible
Event audit log (§10.13) V1 + V6 gate-passage events with timestamps, artifact-version, actor
COVERAGE artifact (§9.15) V5 + V1 counts approved/verified/total; pos/neg coverage; stale-rate
AI-provenance frontmatter fields V6 cost-budget, cost-actual, generated-by, generated-at
Reconciliation audit log V1 + V6 reconciliation runs + findings list ID
Critic-runs audit log (RENAR-5) V1 + V6 critic runs + severity classifications

A substrate without access to any of the sources above cannot implement RENAR-⅘ (§11.7.1, §11.8.1).

12.6.2 Substrate-native monitoring panels (dashboards)

The format (UI/CLI/report-generation) is substrate-specific; the standard does not regulate visualization. The substrate MUST export metrics in a machine-readable format for external audit (§13.6 third-party assessment). Dashboard templates — guide/.

12.6.3 Period aggregation

Per artifact — Hallucination Rate, Cost per Approved Requirement; per period (sprint/week/month) — Coverage Velocity, Reconciliation Findings/Week, ACR; per release — DRA; continuous trending — Multi-model Disagreement Rate, Test-spec Drift Rate. Period boundaries are fixed in the manifest (§13.4.2) under declared-stricter or are taken by default.


12.7 Mapping to SENAR metrics

The full mapping of the ten SENAR §9 metrics to the REQ refinements from §12.3.

SENAR metric (§9) REQ refinement from §12.3
Throughput + Coverage Velocity (§12.3.8) — at the requirements level
Lead Time + RDLT (§12.3.1) — for the requirements phase
FPSR (First-Pass Success Rate) + REQ-FPSR (share of artifacts passing QG-0 without rework) — derived, not a separate §12.3 metric
DER (Defect Escape Rate) + DRA (§12.3.5) — defects at acceptance
KCR (Knowledge Capture Rate) (used as-is; indirectly reinforced through the §12.5.5 outcome)
Cost Predictability + variance of Cost per Approved Requirement (§12.3.9)
Cost-per-task + Cost per Approved Requirement (§12.3.9) — for the requirements phase
MIR (Memory Integrity Rate) (used as-is; reinforced through V1 + V6 at RENAR-4+)
Cycle Time + RDLT (§12.3.1) + Requirement-to-Task Latency (§12.3.2) — both within SENAR Cycle Time
ADR (Adversarial Detection Rate) + ACR (§12.3.6) — adversarial for the requirements zone

Metrics with no SENAR counterpart (new in RENAR):

  • Hallucination Rate (§12.3.3) — specific to AI-generated artifacts.
  • Multi-model Disagreement Rate (§12.3.4) — specific to multi-model generation.
  • Test-spec Drift Rate (§12.3.7) — specific to V5 set-version pinning.
  • Reconciliation Findings per Week (§12.3.10) — specific to continuous reconciliation.
  • Implementation-originated Rate (§12.3.11) — specific to the class of requirements originated by the implementation (§6.13).

12.8 Relationship to other chapters

Chapter Relationship
02 Positioning in the typology of methodologies §2.3 Source-of-Truth inversion + §2.4.2 continuous reconciliation — the foundation for §12.3.10 Reconciliation Findings
07 ADAPT §7.4.5 backward findings — input for §12.3.10; delta-ADAPT — measured through §12.3.5 DRA
08 Specifications §8.5.7 SPEC-AI continuous evaluation — related to §12.3.4 Multi-model Disagreement Rate
09 Test cases §9.12 last-run — input for §12.3.7 Drift Rate; §9.15 COVERAGE — the source for §12.3.8 Velocity and §12.3.7
10 Lifecycle and QG §10.13 event audit log — the basis for all §12.3 metrics; §10.4.2 QG-4 — the gate at which §12.3.5 DRA is captured
03 Substrate versioning V1 + V5 + V6 — capabilities mandatory for substrate-native collection of the §12.3 metrics (§12.6.1)
11 Maturity model §12.3 targets per RENAR-¾/5 level — a concretization of the level criteria from §11.4–§11.8
13 Conformance §12.3 metrics — input for the §13.5 self-assessment; exceeding thresholds (for example, Hallucination Rate > 5% at RENAR-4) — a loss-of-conformance trigger §13.8.1